Iulian.design — web design for local businesses in Dublin

What actually happens in a 2–4 week build

Process · 2026-06-02 · 2 min read · by Iulian Potcolina

“How long will it take” is almost always the second question, right after price. The honest answer is 2–4 weeks for most small business sites — but that range hides a process people rarely get to see from the inside. Here’s what actually happens.

Week 1 — scoping and structure

We talk through what the business actually needs — not a wishlist, the handful of pages and actions that matter (book, call, get directions, see the menu). I map the site structure and send a plan before a single pixel gets designed. This is the step that gets skipped most often elsewhere, and it’s the one that prevents rebuilding pages twice.

Week 2 — design

I design the homepage first, in full, and get it approved before touching the rest — it sets the visual language for every other page, so getting it right once is faster than adjusting five pages later. You see real content, not lorem ipsum; a design reviewed with placeholder text always looks different once the real words go in.

Week 3 — build

This is where it becomes a real, working site — responsive on every device, fast, wired up to whatever you actually need (WhatsApp, booking, maps, contact forms). You get a live preview link during this week, not just a final reveal at the end.

Week 4 — polish and launch

  • Cross-device and cross-browser testing — including on an actual phone, not just a resized browser window.
  • Performance pass — image compression, load-time checks, the unglamorous work that determines whether people actually wait for the page.
  • Basic SEO setup — titles, descriptions, Google Business Profile connection.
  • Domain and hosting handover, with everything explained in plain terms, not left as a mystery you have to trust.
You should never be wondering what’s happening during a build. If you are, that’s a process problem, not a timeline problem.

Complex builds — booking systems, multi-language sites, custom dashboards — take longer, and I’ll tell you that upfront, not three weeks in.